Composite Building Outline Showing each of the three phases
This shows each of the three phases and how they fit together. State Route 31 runs along the bottom of the diagram, with Trenton to the right (as we look at the figure) and Flemington to the left.
Phase 1: 1968 4,138 square foot no basement poured slab floor
Phase 2: 1976 3,536 square foot no basement poured slab floor
Phase 3: 2000 4,178 square foot First Floor 3,515 square foot Basement poured slab basement floor
|